Lifting, Hoisting, and Handling Series

Lifting and Hoisting Operations

Forklift Truck Operations

  • Topics
    • Preparation of Forklift Truck for Operations
    • Safe Operational Procedures
  • Duration

    30 minutes


Offshore Crane Operation

  • Topics
    • Preparation of Offshore Cranes Before Operation
    • Offshore Crane Operations
  • Duration

    33 minutes


Load Handling Operations in Marine Environments

  • Topics
    • Preparation for Handling Loads
    • Rigging Loads Securely
    • Safe Load Handling
    • Handling Cargo From and To Supply Vessels
  • Duration

    32 minutes


Lifting Over Energised Production Equipment

  • Topics
    • Preparations for Lifting Over Energized Production Equipment
    • Safe Operational Procedures for Lifting Over Energized Production Equipment
    • Guidance Notes
  • Duration

    24 minutes


Hands-free Lifting Procedures

  • Topics
    • Preparations for Hands-Free Lifting
    • Safe Hands-Free Lifting Operations
  • Duration

    15 minutes


Personnel Transfer and Work Basket Operations

  • Topics
    • Personnel Transfers
    • Preparations for Personnel Transfer by Basket
    • 10 Rules for Personnel Basket Transfers
    • Personnel Transfer Capsules
    • Prepare for Use of Personnel Work Baskets
  • Duration

    32 minutes


Personnel and Utility Winch Operations

  • Topics
    • Preparation and Use of Personnel and Material Hoists for Operation
    • Preparation and Use of Tugger (Cargo) Winches
    • Operating a Tugger or Cargo Winch
  • Duration

    32 minutes


Lifting Equipment Certification and Inspection

  • Topics
    • The Scheme of Certified Inspection of Lifting Equipment
    • Lifting Equipment Pre-use Inspection Procedures
    • Lifting Equipment Inspection, Testing and Certification Procedures
    • Lifting Equipment Standards and Control Procedures
  • Duration

    19 minutes


Operation of Onshore Cranes

  • Topics
    • The Preparation of Crane and Site for Onshore Crane Operation
    • Preparation of Onshore Cranes for Operation
    • Onshore Crane Operations
  • Duration

    20 minutes


Handling Cargo From and To Supply Vessels

  • Topics
    • Handling Cargo From and To Supply Vessels
  • Duration

    20 minutes


Cargo Carrying Units and Flexible Intermediate Bulk Containers

  • Topics
    • Cargo Carrying Units
    • Flexible Intermediate Bulk Containers
  • Duration

    20 minutes


Overhead Traveling and Gantry Crane Operations

  • Topics
    • Preparation of Overhead Cranes for Operation
    • Overhead Travelling and Gantry Crane Operations
    • Shutting Down Overhead Travelling and Gantry Cranes
  • Duration

    20 minutes